Lansdowne 2.0

Share Lansdowne 2.0 on Facebook Share Lansdowne 2.0 on Twitter Share Lansdowne 2.0 on Linkedin Email Lansdowne 2.0 link

Investing in a City-owned landmark

Lansdowne is one of Ottawa’s most iconic gathering places. It’s a space where people can cheer on local teams, attend concerts and festivals, enjoy the farmers’ market, meet friends for dinner, or simply spend time outdoors. As the City owns the land and all buildings at Lansdowne, it is the City's responsibility to maintain these facilities.

Some of the site’s important public facilities, including the stadium’s north side stands and the event centre, are nearing the end of their useful life and no longer meet today’s standards, particularly in the area of accessibility. The nearly 60-year-old event centre and north side stands require extensive and costly maintenance to remain operational, with costs only increasing as more time passes.

Lansdowne 2.0 is a strategic plan to modernize these aging facilities, improve public spaces, add more homes and businesses, and ensure Lansdowne continues to serve as a year-round destination. The plan protects and enhances an asset that belongs to the people of Ottawa, leveraging the City’s investment with significant revenues that will pay the majority of the cost. This initiative is focused on maintaining public infrastructure and creating an improved space for residents, visitors, and future generations.

What’s included in Lansdowne 2.0?

Lansdowne 2.0 is the City’s innovative plan to update the site so it can continue to serve residents and visitors for decades to come. The proposal aims to enhance the experience for everyone who visits or lives on-site and generate revenues to offset most of the cost of construction.

The revitalized Lansdowne will include:

A new and improved event centre: This will replace the aging TD Place Arena (formerly the Civic Centre) and create a more attractive venue for concerts, community events, and professional sports. Core priorities for the new centre include full accessibility and gender-inclusive facilities. The event centre will feature a striking exterior and improved energy efficiency. It is also being designed to specifically address the needs of professional women’s sports, including the Ottawa Charge, with customized dressing rooms and training spaces.

The event centre will accommodate up to 7,000 people for concerts and 6,600 for hockey. This total capacity includes 5,850 seats combined with popular modern viewing areas where fans can gather together to watch while standing. Based on consultation with event organizers, tourism officials, and others, this size is strategically planned for the Ottawa market, positioning the facility between the more intimate National Arts Centre and larger venues like the Canadian Tire Centre and a potential new downtown arena.

Modern north side stadium stands at TD Place: These will offer upgraded seating, wider concourses, additional washrooms, and significantly improved accessibility for fans and visitors. Like the south side stands, the new stands will no longer have a roof, though the City is exploring options to provide some weather protection.

New housing: The project will introduce hundreds of new residential units to Lansdowne, contributing to Ottawa's housing needs. The City will earn revenue from the sale of air rights (the rights to build above the land) for these towers, which will help fund Lansdowne 2.0 and affordable housing in Ottawa.

Revitalized Public Spaces: Lansdowne 2.0 will feature reinvigorated public areas and green spaces including the return of the Great Lawn for festivals and concerts, and the reintroduction of a berm for play, relaxation, concert viewing, and tobogganing. These spaces are intended for year-round community activities, events, and recreation. New pathways, seating areas, and outdoor venues will enhance the visitor and resident experience.

Public Art Program: $2 million of the total project budget will be dedicated to creating dynamic public art installations, celebrating Ottawa's diverse culture.

These upgrades are designed to replace aging infrastructure, improve accessibility and sustainability, and support tourism, small businesses and local jobs, making Lansdowne a more inclusive and vibrant year-round destination.

The construction plan has been created in close collaboration with local businesses and residents. All major events, such as outdoor markets and CFL, NSL, CPL, PWHL, OHL and CEBL games, would continue during construction.

Investing in a City-owned landmark

Lansdowne is one of Ottawa’s most iconic gathering places. It’s a space where people can cheer on local teams, attend concerts and festivals, enjoy the farmers’ market, meet friends for dinner, or simply spend time outdoors. As the City owns the land and all buildings at Lansdowne, it is the City's responsibility to maintain these facilities.

Some of the site’s important public facilities, including the stadium’s north side stands and the event centre, are nearing the end of their useful life and no longer meet today’s standards, particularly in the area of accessibility. The nearly 60-year-old event centre and north side stands require extensive and costly maintenance to remain operational, with costs only increasing as more time passes.

Lansdowne 2.0 is a strategic plan to modernize these aging facilities, improve public spaces, add more homes and businesses, and ensure Lansdowne continues to serve as a year-round destination. The plan protects and enhances an asset that belongs to the people of Ottawa, leveraging the City’s investment with significant revenues that will pay the majority of the cost. This initiative is focused on maintaining public infrastructure and creating an improved space for residents, visitors, and future generations.

What’s included in Lansdowne 2.0?

Lansdowne 2.0 is the City’s innovative plan to update the site so it can continue to serve residents and visitors for decades to come. The proposal aims to enhance the experience for everyone who visits or lives on-site and generate revenues to offset most of the cost of construction.

The revitalized Lansdowne will include:

A new and improved event centre: This will replace the aging TD Place Arena (formerly the Civic Centre) and create a more attractive venue for concerts, community events, and professional sports. Core priorities for the new centre include full accessibility and gender-inclusive facilities. The event centre will feature a striking exterior and improved energy efficiency. It is also being designed to specifically address the needs of professional women’s sports, including the Ottawa Charge, with customized dressing rooms and training spaces.

The event centre will accommodate up to 7,000 people for concerts and 6,600 for hockey. This total capacity includes 5,850 seats combined with popular modern viewing areas where fans can gather together to watch while standing. Based on consultation with event organizers, tourism officials, and others, this size is strategically planned for the Ottawa market, positioning the facility between the more intimate National Arts Centre and larger venues like the Canadian Tire Centre and a potential new downtown arena.

Modern north side stadium stands at TD Place: These will offer upgraded seating, wider concourses, additional washrooms, and significantly improved accessibility for fans and visitors. Like the south side stands, the new stands will no longer have a roof, though the City is exploring options to provide some weather protection.

New housing: The project will introduce hundreds of new residential units to Lansdowne, contributing to Ottawa's housing needs. The City will earn revenue from the sale of air rights (the rights to build above the land) for these towers, which will help fund Lansdowne 2.0 and affordable housing in Ottawa.

Revitalized Public Spaces: Lansdowne 2.0 will feature reinvigorated public areas and green spaces including the return of the Great Lawn for festivals and concerts, and the reintroduction of a berm for play, relaxation, concert viewing, and tobogganing. These spaces are intended for year-round community activities, events, and recreation. New pathways, seating areas, and outdoor venues will enhance the visitor and resident experience.

Public Art Program: $2 million of the total project budget will be dedicated to creating dynamic public art installations, celebrating Ottawa's diverse culture.

These upgrades are designed to replace aging infrastructure, improve accessibility and sustainability, and support tourism, small businesses and local jobs, making Lansdowne a more inclusive and vibrant year-round destination.

The construction plan has been created in close collaboration with local businesses and residents. All major events, such as outdoor markets and CFL, NSL, CPL, PWHL, OHL and CEBL games, would continue during construction.

  • Project updates

    Share Project updates on Facebook Share Project updates on Twitter Share Project updates on Linkedin Email Project updates link

    Lansdowne 2.0 Project Update

    Lansdowne 2.0 Construction – Monthly Newsletter - January 2026

    January 7, 2026

    Welcome to the first edition of our monthly Lansdowne 2.0 newsletter.

    We are glad to have you following along as the City builds a new Event Centre, modern North Side Stands, and renewed public spaces.

    The project will roll out in three distinct construction phases:

    1. New Event Centre (Q4 2025-Q3 2028)
    2. New North Side Stands (Q4 2028-Q4 2030)
    3. Mixed-use development and retail spaces (Starting in 2031)

    Construction is being executed by EBC Inc., with oversight from the City of Ottawa.

    Each newsletter will include a summary of the work completed over the past month, an overview of the schedule for the month ahead, and important updates related to the construction project. We will also sprinkle in some interesting facts and figures to help keep you informed about what is happening behind the scenes.

    Completed Work

    December marked the start of preliminary work for the Event Centre. This work sets the stage before construction can begin.

    Here is what was accomplished:

    • Fencing: The Event Centre construction site has been secured with a mix of fencing and hoarding located around the Great Lawn, adjacent to the TD Place east endzone, and along the temporary haul road behind the South Side Stands. This measure will safely separate construction zones from public areas to minimize disruption and ensure a safe environment for everyone.
    • Great Lawn and sledding hill: The Great Lawn and sledding hill have been temporarily closed to the public to allow for the construction of the new Event Centre. Once the new Event Centre is complete, a reinstated Great Lawn and sledding hill will reopen to the public. For further information on alternative sledding hill options, please visit ottawa.ca.
    • Tree removals completed: Tree removal was limited strictly to areas required for construction. To offset these removals, a comprehensive replanting plan is in place:
      • City-owned trees will be replaced at a one-for-one ratio.
      • NCC-owned trees will be replaced at a two-for-one ratio.
      • In total, the 122 trees removed will be replaced by 126 new trees.
      • Protective measures will be put in place to safeguard the remaining trees that are nearby construction.
    • Site trailer set up: The trailers that will serve as temporary offices for the Lansdowne 2.0 project teams were delivered.
    • Public Information Session: Thanks to everyone who joined us on December 17. Missed it? You can check out the boards on our project website.


    Photo 1: Site trailers have been delivered and set up will be completed in January.


    Photo 2: The temporary haul road is located behind the South Side Stands and is fenced on both sides.

    Upcoming Construction Activities

    The beginning of 2026 will focus on the excavation and servicing for the future Event Centre.

    Here is what is on the schedule for January:

    • Removing topsoil
    • Starting berm excavation
    • Removal, relocation and storing of Moving Surfaces artwork
    • Localized demolition of portions of the existing South and North Side Stands. This includes a small portion of the lower-level South Side Stands adjacent to the east end zone and the removal of stairs and ramps outside of Gate 4. Access to TD Place events will continue to be available at all other gates throughout the construction of the new Event Centre.

    Managing Construction Traffic and Minimizing Impacts

    We understand that where construction vehicles travel is important to the community. Your safety is our top priority and we have the following measures in place:

    • Everyone working on the project, including City Staff, consultants and contractors, receive a community overview prior to starting work to understand the importance of safely constructing the project within an established neighborhood.
    • Construction traffic will be actively monitored and managed.
    • Flag persons will be in place to direct traffic where required.
    • On-site project team will oversee work and respond to community feedback.

    The construction of Lansdowne 2.0 will see construction traffic follow a dedicated route along Bank Street when entering and exiting Lansdowne.

    Further details regarding the flow of construction traffic in and out of Lansdowne will be shared in advance of upcoming excavation work.

    Lansdowne remains open

    As construction moves forward, Lansdowne remains safe, active, and open for business. We are working hard to keep your favourite spots accessible and vibrant. Please continue to support local businesses.

    Keeping you informed

    We are committed to keeping you informed throughout the project through our project newsletter, our project website, social media, and community pop-ups.

    Questions? Email us at LansdowneRenewal@ottawa.ca or visit ottawa.ca/LansdowneRenewal.

    On Thursday January 22, we will be hosting our first community pop-up at the Horticulture building located at 1525 Princess Patricia Way between 11 am and 2 pm. Feel free to stop by to ask questions or say hello to the project team.



    Lansdowne 2.0 Construction – Public Information Session

    The City of Ottawa invites you to attend a public information session to discuss the redevelopment and construction of Lansdowne 2.0. Staff will be present to explain how Lansdowne 2.0 will be constructed and available to answer questions.

    This is a drop-in session for residents and the public to meet the construction team, learn more about the project and upcoming construction milestones. Please attend at your leisure.

    All information boards presented at the Public Information Session will be available online and posted to the Lansdowne 2.0 Engage Ottawa project page after the event.

    Date and time

    Wednesday, December 17, 2025

    6 pm to 8 pm

    Location

    TD Place Arena, Concourse between Gates 2 and 3

    Please enter via Gate 2 off Exhibition Way or via accessible entry at Gate 1 on Bank Street

    What: To prepare for the construction of the new Event Centre, preliminary works will include installation of fencing, mobilization of site trailers and equipment within the construction area, topsoil removal, implementation of a hauling road behind the south side stands, and modifications to TD Place to maintain operations during redevelopment.

    Why: Preliminary works will support the construction of the new Event Centre, east of the east endzone, within the Great Lawn.

    When: Phase one will include the new Event Centre and Great Lawn (December 2025 – July 2028).

    Where: The limits of construction associated with this project are within the Great Lawn to the east endzone of TD Place. As work begins, steps will be taken to safely separate construction zones from public areas to minimize disruption and ensure a safe environment for everyone.

    Who: The City of Ottawa has retained the contractor, EBC Inc., to complete the work.

    Safety

    The City of Ottawa is committed to safety in and around project sites. The project team continues to work closely with the industry and to comply with recommendations provided by municipal, provincial and federal health officials, as well as the Ministry of Labour, Immigration, Training and Skills Development.

    For further information about this project and/or to submit comments, please contact the project team:


    Justin Kurosky

    Manager, Design & Construction-Facilities

    Lansdowne 2.0

    Email: LansdowneRenewal@ottawa.ca

    David Jones

    Program Manager, Communications and Engagement

    Lansdowne 2.0

    Email: LansdowneRenewal@ottawa.ca

  • Construction notices

    Share Construction notices on Facebook Share Construction notices on Twitter Share Construction notices on Linkedin Email Construction notices link

    Lansdowne 2.0 Construction Notice

    Phase 1 (Event Centre)

    The Lansdowne 2.0 project will revitalize and modernize publicly owned assets at Lansdowne, ensuring it remains a vibrant and sustainable destination for residents and visitors for decades to come. The redevelopment plan includes a new Event Centre, new North Side Stands, public realm enhancements, replacement retail, and a private development of two residential towers.

    Preparatory works for the new Event Centre will be commencing in early December. Included below is a detailed overview of the first phase of construction.

    To stay up to date on the project, visit the Lansdowne 2.0 project website and sign up for the project newsletter at ottawa.ca/LansdowneRenewal.

    What: To prepare for the construction of the new Event Centre, preliminary works will include installation of fencing, mobilization of site trailers and equipment within the construction area, topsoil removal, implementation of a hauling road behind the South Side Stands, and modifications to TD Place to maintain operations during the redevelopment.

    Why: Preliminary works will support the construction of the new Event Centre, east of the east endzone, within the Great Lawn.

    When: Preparatory activities for Event Centre construction will begin in early December. Further information on project timelines can be found on the project website.

    Where: The limits of construction associated with this project are within the Great Lawn. As work begins, fencing and hoarding will safely separate construction zones from public areas to minimize disruption and ensure a safe environment for everyone.

    Who: The City of Ottawa has retained the contractor, EBC Inc., to complete the work.

    Accessibility

    Accessibility is an important consideration for the City of Ottawa. The City makes every effort to provide access through and around construction sites. If you require a disability-related accommodation, please contact the undersigned. Accessible formats and communication supports are available, upon request, at the following link: www.ottawa.ca/accessibleformat.

    Traffic impacts

    There are currently no planned detours or road closures. Access to the underground garage from Queen Elizabeth Drive, Exhibition Way, and residential access off Holmwood Avenue will remain open. All internal streets will remain open, including Marché Way, Exhibition Way, Princess Patricia Way and Paul Askin Way.

    A dedicated hauling road will be established behind the South Side Stands to reduce local traffic impacts within Lansdowne Park. Further information on hauling activities will be made available on the project website.

    Construction disruptions

    Lansdowne 2.0 will be built with the community in mind, keeping the site safe, active, vibrant and open for business throughout construction. This includes all commercial spaces and residences. Measures will be in place to keep construction activities separate from public spaces as much as possible.

    Every precaution will be made to minimize disruptions, and we would like to thank the public in advance for their patience and co-operation. For construction activity hours of work, the City of Ottawa follows provincial requirements and the City’s Noise By-law (2017-255).

    Safety

    The City of Ottawa is committed to safety in and around project sites. The project team continues to work closely with the industry and to comply with recommendations provided by municipal, provincial and federal health officials, as well as the Ministry of Labour, Immigration, Training and Skills Development.

    Stay Informed

    The Lansdowne 2.0 project team is committed to keeping you informed throughout the project.

    Please visit ottawa.ca/LansdowneRenewal to stay informed of upcoming work and subscribe to the project newsletter.

    A drop-in public information session is being planned to allow residents to learn more about how Lansdowne 2.0 will be constructed, outline construction milestones and mitigation efforts. Once confirmed, further information on the drop-in session will be shared on the Lansdowne 2.0 Engage Ottawa project page and through the City’s various communications channels.

    In the event of an emergency outside normal working hours on weekdays and weekends, please call the City of Ottawa at 3-1-1. For further information about this project, please contact the project team’s dedicated inbox.

    Justin Kurosky

    Manager, Design & Construction-Facilities

    Lansdowne 2.0

    Email: LansdowneRenewal@ottawa.ca

    David Jones

    Program Manager, Communications and Engagement

    Lansdowne 2.0

    Email: LansdowneRenewal@ottawa.ca

  • Council approves Lansdowne 2.0 redevelopment plan

    Share Council approves Lansdowne 2.0 redevelopment plan on Facebook Share Council approves Lansdowne 2.0 redevelopment plan on Twitter Share Council approves Lansdowne 2.0 redevelopment plan on Linkedin Email Council approves Lansdowne 2.0 redevelopment plan link

    Council approved the Lansdowne 2.0 redevelopment and construction plan, that invests in a City-owned asset. It includes a new event centre, new north side stands, a new retail space and two residential towers.

    The approved plan carries an estimated net investment of $130.7 million by the City, that delivers on a City-owned asset valued at $418.8 million.

    The City is committed to keeping residents and businesses informed throughout the redevelopment of Lansdowne Park. Additional information and opportunities for the public to learn more about the project will be made available prior to the commencement of construction.

  • Lansdowne 2.0: Final Report and Next Steps

    Share Lansdowne 2.0: Final Report and Next Steps on Facebook Share Lansdowne 2.0: Final Report and Next Steps on Twitter Share Lansdowne 2.0: Final Report and Next Steps on Linkedin Email Lansdowne 2.0: Final Report and Next Steps link

    The Lansdowne 2.0 Redevelopment and Authorization to Proceed report is now available. This comprehensive document outlines the final recommendations for City Council’s consideration as part of the phased approval process for the Lansdowne 2.0 renewal project.

    Following on the April 2024 Council approval of a Design-Bid-Build project delivery model, City staff have completed the detailed facility design, received site plan approval for the new facilities, successfully tendered the construction design to pre-qualified general contractors, and successfully tendered the strata property rights (subterranean and air) for a mixed-use development opportunity.

    Construction Contract

    EBC Inc., a leading Canadian construction firm, submitted the best value bid of $312.8 million for the new Event Centre and North Side Stands.

    Air Rights Development

    Mirabella Development Corporation has been selected as the preferred proponent for the mixed-use development, with a winning bid of $65 million—up from the original $39 million estimate.

    Project Budget Update

    The total project budget is now $418.8 million, a reduction of $279,000 from the original estimate. Despite a slight increase in debt servicing costs, the City’s share has decreased from $5M to $4.3M due to improved revenue projections.

    Next Steps:

    City staff will present the final construction pricing and funding strategy to the Finance and Corporate Services Committee on October 29, with final Council consideration on November 7.

Page last updated: 07 Jan 2026, 02:17 PM