S4 - Leitrim - West of Bank Street - Future Neighbourhood

Share S4 - Leitrim - West of Bank Street - Future Neighbourhood on Facebook Share S4 - Leitrim - West of Bank Street - Future Neighbourhood on Twitter Share S4 - Leitrim - West of Bank Street - Future Neighbourhood on Linkedin Email S4 - Leitrim - West of Bank Street - Future Neighbourhood link
location of the S-4 Future Neighbourhood

This page will be your hub for all documents, opportunities to engage and other information related to the neighbourhood plan for Leitrim West.

Leitrim West is identified on the map below, located in south of the City as a continuation of the Leitrim Community in Ward Riverside South-Findlay Creek. It is approximately 15 hectares in size and will provide much needed housing for about 500 new residents.

Planning and engineering studies for this future neighbourhood began in spring 2024 and are anticipated to be completed in early 2025 with the approval of a concept plan and supporting studies.

Background

In 2021, Council approved expansion to the urban boundary across the City including the Leitrim West area.

The City of Ottawa Official Plan sets out a process to develop new communities. The process begins with a proponent-initiated Community Design Plan. The purpose of a Community Design Plan is to establish a community-wide land-use framework that reflects the principles, objectives and policies for community development as directed by the Official Plan. The Community Design Plan enables communities to establish incrementally over time in an optimum and coordinated manner.

The Environmental Assessment Master Plan

The Environmental Assessment Master Plan will identify the recommended transportation, water, sanitary, and stormwater infrastructure required to service the new community. Approach 2 fulfills Phase 1 (Problem or Opportunity) and Phase 2 (Alternative Solutions) of the Municipal Class Environmental Assessment process to obtain Master Plan approval under the Environmental Assessment Act and will be integrated with Planning Act approvals for future development of the land. This integrated process will allow for coordination of land-use planning and infrastructure planning. The area subject to the process is shown in the key map below.

Stay informed

To receive future project updates, please join the project mailing list by emailing us at suburb@ottawa.ca.

This page will be your hub for all documents, opportunities to engage and other information related to the neighbourhood plan for Leitrim West.

Leitrim West is identified on the map below, located in south of the City as a continuation of the Leitrim Community in Ward Riverside South-Findlay Creek. It is approximately 15 hectares in size and will provide much needed housing for about 500 new residents.

Planning and engineering studies for this future neighbourhood began in spring 2024 and are anticipated to be completed in early 2025 with the approval of a concept plan and supporting studies.

Background

In 2021, Council approved expansion to the urban boundary across the City including the Leitrim West area.

The City of Ottawa Official Plan sets out a process to develop new communities. The process begins with a proponent-initiated Community Design Plan. The purpose of a Community Design Plan is to establish a community-wide land-use framework that reflects the principles, objectives and policies for community development as directed by the Official Plan. The Community Design Plan enables communities to establish incrementally over time in an optimum and coordinated manner.

The Environmental Assessment Master Plan

The Environmental Assessment Master Plan will identify the recommended transportation, water, sanitary, and stormwater infrastructure required to service the new community. Approach 2 fulfills Phase 1 (Problem or Opportunity) and Phase 2 (Alternative Solutions) of the Municipal Class Environmental Assessment process to obtain Master Plan approval under the Environmental Assessment Act and will be integrated with Planning Act approvals for future development of the land. This integrated process will allow for coordination of land-use planning and infrastructure planning. The area subject to the process is shown in the key map below.

Stay informed

To receive future project updates, please join the project mailing list by emailing us at suburb@ottawa.ca.

  • Public open house #2 - July 22, 2025 (completed)

    Share Public open house #2 - July 22, 2025 (completed) on Facebook Share Public open house #2 - July 22, 2025 (completed) on Twitter Share Public open house #2 - July 22, 2025 (completed) on Linkedin Email Public open house #2 - July 22, 2025 (completed) link
    CLOSED: This discussion has concluded.

    We wish to thank residents for participating in the second public open house on the future neighbourhood plan for Leitrim West which was held on July 22, 2025 at the Fred Barrett Arena, 3280 Leitrim Road.

    The purpose of the event was to present:

    • the existing environmental, infrastructure, transportation, and planning conditions that will inform the future neighbourhood
    • the problems and opportunities to be addressed
    • a preferred block plan illustrating the potential land uses, street fabric and development height and density

    This session offered an opportunity for residents to review the planning process and provide input to the project team.

  • Public open house #1 - October 29, 2024 (completed)

    Share Public open house #1 - October 29, 2024 (completed) on Facebook Share Public open house #1 - October 29, 2024 (completed) on Twitter Share Public open house #1 - October 29, 2024 (completed) on Linkedin Email Public open house #1 - October 29, 2024 (completed) link
    CLOSED: This discussion has concluded.

    Thank you to all those who participated at the public open house on October 29, 2024 held at the Fred Barrett Arena, 3280 Leitrim Road .

    The public open house presented the study process, including the Environmental Assessment Master Plan process, the existing environmental conditions, the problems and opportunities to be addressed, and alternative solutions for servicing the site.

Page last updated: 20 Nov 2025, 09:14 AM