Pauline Vanier Park - Swing Set Renewal

Share Pauline Vanier Park - Swing Set Renewal on Facebook Share Pauline Vanier Park - Swing Set Renewal on Twitter Share Pauline Vanier Park - Swing Set Renewal on Linkedin Email Pauline Vanier Park - Swing Set Renewal link

Pauline Vanier Park Swing Set Renewal - We Want Your Feedback!

Pauline Vanier Park, located in Ward 16 (River) is a popular neighbourhood greenspace next to General Vanier Public School that features play structures, a wading pool, paved pathways, baseball fields, and open lawn areas. The City of Ottawa is planning to replace the aging swing sets as part of the City’s Lifecycle Replacement program.

This project has been designed in accordance with the City of Ottawa’s Accessibility Design Standards and will include new engineered wood fiber safety surfacing.

Project Timeline:

  • Design: 2025
  • Construction: 2026

You can view and compare the proposed swing designs by downloading the Swing Set Equipment Options (on the right-hand panel).

The proposed equipment includes various combinations of bucket, bench, belt, adaptive and saucer swings.

We want to hear which swing options you like best! Please share your thoughts and choose your favourite options by filling out the short survey below.

Please be aware that the final equipment may differ from the concepts being presented, as a result of public feedback, technical detailing, and supply and/or budget constraints.

Option 1: Includes Option 1.1 & Option 1.2


Option 2: Includes Option 2.1 & Option 2.2




Pauline Vanier Park Swing Set Renewal - We Want Your Feedback!

Pauline Vanier Park, located in Ward 16 (River) is a popular neighbourhood greenspace next to General Vanier Public School that features play structures, a wading pool, paved pathways, baseball fields, and open lawn areas. The City of Ottawa is planning to replace the aging swing sets as part of the City’s Lifecycle Replacement program.

This project has been designed in accordance with the City of Ottawa’s Accessibility Design Standards and will include new engineered wood fiber safety surfacing.

Project Timeline:

  • Design: 2025
  • Construction: 2026

You can view and compare the proposed swing designs by downloading the Swing Set Equipment Options (on the right-hand panel).

The proposed equipment includes various combinations of bucket, bench, belt, adaptive and saucer swings.

We want to hear which swing options you like best! Please share your thoughts and choose your favourite options by filling out the short survey below.

Please be aware that the final equipment may differ from the concepts being presented, as a result of public feedback, technical detailing, and supply and/or budget constraints.

Option 1: Includes Option 1.1 & Option 1.2


Option 2: Includes Option 2.1 & Option 2.2




  • Take Survey
    Share Pauline Vanier Park Swing Replacement Project on Facebook Share Pauline Vanier Park Swing Replacement Project on Twitter Share Pauline Vanier Park Swing Replacement Project on Linkedin Email Pauline Vanier Park Swing Replacement Project link
Page last updated: 12 Sep 2025, 03:34 PM