Share Meadowvale Terrace Park on FacebookShare Meadowvale Terrace Park on TwitterShare Meadowvale Terrace Park on LinkedinEmail Meadowvale Terrace Park link
Meadowvale Terrace Park, Swings Lifecycle Replacement
The City would like to share the concept design to replace the existing swings at Meadowvale Terrace Park, located at 1205 Trenton Avenue in Ward 16.
You can download and review the proposed concept design by following the link in the ‘Document Library’ (located on the panel to the right). The proposed concept has been designed to meet the City of Ottawa Accessibility Design Standards that include new swings with 2 buckets, 2 belt and 1 accessible saucer swing installed in engineered wood fiber safety surfacing. In addition to an accessible path that will lead to the new swing set, the project will also include an accessible park bench and replacement of the deteriorated timber edge that surrounds the existing play structure.
The proposed timeline for construction start is fall of 2024.
Please note: this project falls under the Lifecycle Replacement program. Council has approved the budget and the scope, therefore upgrades and/or replacement of the other existing amenities in the park are beyond the scope of this project. Your understanding is appreciated.
Comments will be received until May 30, 2024.
Please be aware that the final park plan may differ from the concept being presented as a result of the public consultation responses, technical detailing, and supply and/or financial constraints.
Meadowvale Terrace Park, Swings Lifecycle Replacement
The City would like to share the concept design to replace the existing swings at Meadowvale Terrace Park, located at 1205 Trenton Avenue in Ward 16.
You can download and review the proposed concept design by following the link in the ‘Document Library’ (located on the panel to the right). The proposed concept has been designed to meet the City of Ottawa Accessibility Design Standards that include new swings with 2 buckets, 2 belt and 1 accessible saucer swing installed in engineered wood fiber safety surfacing. In addition to an accessible path that will lead to the new swing set, the project will also include an accessible park bench and replacement of the deteriorated timber edge that surrounds the existing play structure.
The proposed timeline for construction start is fall of 2024.
Please note: this project falls under the Lifecycle Replacement program. Council has approved the budget and the scope, therefore upgrades and/or replacement of the other existing amenities in the park are beyond the scope of this project. Your understanding is appreciated.
Comments will be received until May 30, 2024.
Please be aware that the final park plan may differ from the concept being presented as a result of the public consultation responses, technical detailing, and supply and/or financial constraints.
Thank you for your contribution!
Help us reach out to more people in the community
Share this with family and friends