Eagleson Road & Flewellyn Road Functional Design Study

Share Eagleson Road & Flewellyn Road Functional Design Study on Facebook Share Eagleson Road & Flewellyn Road Functional Design Study on X (formerly Twitter) Share Eagleson Road & Flewellyn Road Functional Design Study on Linkedin Email Eagleson Road & Flewellyn Road Functional Design Study link

The Eagleson Road and Flewellyn Road intersection is an unsignalized rural T-intersection with stop control on Flewellyn Road. Increasing traffic volumes and limited gaps on Eagleson Road are causing growing delays and safety concerns creating the need for long-term improvement. As part of this study, the City evaluated several alternatives including maintaining the existing unsignalized intersection, introducing traffic signals with or without auxiliary turn lanes, and constructing a single-lane roundabout. Although each alternative is technically feasible, the roundabout achieved the stronger overall evaluation and emerged as the technically preferred alternative.


What is being asked of the public?

  • Do you have any comments on the Roundabout option (recommended option)?
  • Do you have any comments on the Traffic Signal option?
  • Do you have any other comments on this project?

Key Dates/Timeline

  • Public Engagement period: August 17th – September 04th, 2026

Ways to Engage

  • Please share your thoughts by completing the Survey, which will be available from August 17th – September 04th, 2026.

The Eagleson Road and Flewellyn Road intersection is an unsignalized rural T-intersection with stop control on Flewellyn Road. Increasing traffic volumes and limited gaps on Eagleson Road are causing growing delays and safety concerns creating the need for long-term improvement. As part of this study, the City evaluated several alternatives including maintaining the existing unsignalized intersection, introducing traffic signals with or without auxiliary turn lanes, and constructing a single-lane roundabout. Although each alternative is technically feasible, the roundabout achieved the stronger overall evaluation and emerged as the technically preferred alternative.


What is being asked of the public?

  • Do you have any comments on the Roundabout option (recommended option)?
  • Do you have any comments on the Traffic Signal option?
  • Do you have any other comments on this project?

Key Dates/Timeline

  • Public Engagement period: August 17th – September 04th, 2026

Ways to Engage

  • Please share your thoughts by completing the Survey, which will be available from August 17th – September 04th, 2026.
  • Take Survey