Share Concerto Park: New Park Development on FacebookShare Concerto Park: New Park Development on X (formerly Twitter)Share Concerto Park: New Park Development on LinkedinEmail Concerto Park: New Park Development link
The City of Ottawa is seeking feedback on the proposed design for Concerto Park, the anticipated name of a new park at 515 Concerto Lane in Barrhaven West (Ward 3).
The approximately 0.89-hectare park will be located next to City-owned land that is expected to be developed as a district park through a future project. Although the current concept plan is limited to Concerto Park, the design will consider how the two park areas can eventually function as a coordinated recreational space.
The proposed park design includes:
Play equipment for younger and older children, generally ranging from 18 months to 12 years old
Swings, including toddler swings, belt swings and an accessible swing
Accessible pathways connecting the park to the surrounding sidewalk network
An open grass area for informal play
Benches and other park furnishings
New deciduous and coniferous trees
A park identification sign
A pathway designed to accommodate park-maintenance access and, where feasible, function as a looped trike track
The park will be designed in accordance with applicable City of Ottawa accessibility standards and playground safety requirements.
Playground options
Two playground equipment and colour options are being considered:
Playground Option 1: Blue / Green
Playground Option 2: Teal / Red
Both options are intended to provide a mix of play experiences for younger and older children. Please review the concept plan and the two playground options and then complete the survey below.
The survey asks which option you prefer, and which playground features are most important to you. Your feedback will be reviewed by the project team and will help to inform the final playground selection and park design.
The final design may differ from the concept presented as a result of public feedback, technical requirements, accessibility and safety standards, site conditions, equipment availability and project budget.
The survey will remain open until Monday, December 14.
Construction is currently anticipated to begin in the spring/summer of 2027, subject to design approvals, contractor scheduling, and site conditions.
The City of Ottawa is seeking feedback on the proposed design for Concerto Park, the anticipated name of a new park at 515 Concerto Lane in Barrhaven West (Ward 3).
The approximately 0.89-hectare park will be located next to City-owned land that is expected to be developed as a district park through a future project. Although the current concept plan is limited to Concerto Park, the design will consider how the two park areas can eventually function as a coordinated recreational space.
The proposed park design includes:
Play equipment for younger and older children, generally ranging from 18 months to 12 years old
Swings, including toddler swings, belt swings and an accessible swing
Accessible pathways connecting the park to the surrounding sidewalk network
An open grass area for informal play
Benches and other park furnishings
New deciduous and coniferous trees
A park identification sign
A pathway designed to accommodate park-maintenance access and, where feasible, function as a looped trike track
The park will be designed in accordance with applicable City of Ottawa accessibility standards and playground safety requirements.
Playground options
Two playground equipment and colour options are being considered:
Playground Option 1: Blue / Green
Playground Option 2: Teal / Red
Both options are intended to provide a mix of play experiences for younger and older children. Please review the concept plan and the two playground options and then complete the survey below.
The survey asks which option you prefer, and which playground features are most important to you. Your feedback will be reviewed by the project team and will help to inform the final playground selection and park design.
The final design may differ from the concept presented as a result of public feedback, technical requirements, accessibility and safety standards, site conditions, equipment availability and project budget.
The survey will remain open until Monday, December 14.
Construction is currently anticipated to begin in the spring/summer of 2027, subject to design approvals, contractor scheduling, and site conditions.