Alcide Trudeau Park (Vars) - Pathway Replacement Project

Share Alcide Trudeau Park (Vars) - Pathway Replacement Project on Facebook Share Alcide Trudeau Park (Vars) - Pathway Replacement Project on Twitter Share Alcide Trudeau Park (Vars) - Pathway Replacement Project on Linkedin Email Alcide Trudeau Park (Vars) - Pathway Replacement Project link
Image of Concept Plan

Alcide Trudeau Park – Pathway Renewal

Alcide Trudeau Park Park is in Ward 20 - OSGOODE. The park currently provides residents with various recreational amenities, such as play structures, baseball diamond, walking paths and a community building.

The pathways in the park are approx. 1.5m wide. The pathways appear to be original to the parks construction and are definitely showing their age and significant signs of deterioration. The need for a full pathway reconstruction is warranted. The new pathways are to be medium duty with a 2m width. An approximate total of 450 linear meters are slated for replacement.

Construction will take place in mid-summer of 2024. Localized closure of the park for the construction period may be required.

For further information please contact:

Warren Bedford

Planner 2, Parks and Facilities Planning

Recreation, Cultural and Facility Services Dept.,

City of Ottawa

100 Constellation Drive, Ottawa K2G 6J8

warren.bedford@ottawa.ca

Alcide Trudeau Park – Pathway Renewal

Alcide Trudeau Park Park is in Ward 20 - OSGOODE. The park currently provides residents with various recreational amenities, such as play structures, baseball diamond, walking paths and a community building.

The pathways in the park are approx. 1.5m wide. The pathways appear to be original to the parks construction and are definitely showing their age and significant signs of deterioration. The need for a full pathway reconstruction is warranted. The new pathways are to be medium duty with a 2m width. An approximate total of 450 linear meters are slated for replacement.

Construction will take place in mid-summer of 2024. Localized closure of the park for the construction period may be required.

For further information please contact:

Warren Bedford

Planner 2, Parks and Facilities Planning

Recreation, Cultural and Facility Services Dept.,

City of Ottawa

100 Constellation Drive, Ottawa K2G 6J8

warren.bedford@ottawa.ca

  • CLOSED: This survey has concluded.
    Share Alcide Trudeau Park pathway redevelopment project feedback. on Facebook Share Alcide Trudeau Park pathway redevelopment project feedback. on Twitter Share Alcide Trudeau Park pathway redevelopment project feedback. on Linkedin Email Alcide Trudeau Park pathway redevelopment project feedback. link
Page last updated: 24 Apr 2024, 04:24 PM