Share Strandherd Ultimate Fields: Relocation Project on FacebookShare Strandherd Ultimate Fields: Relocation Project on TwitterShare Strandherd Ultimate Fields: Relocation Project on LinkedinEmail Strandherd Ultimate Fields: Relocation Project link
The City is looking for your feedback on the proposed plan for the relocation of the Strandherd Ultimate Fields, currently located at 4061 Strandherd Drive in Barrhaven West (Ward 3). The new location of the fields will be a short distance away, at 3180 Borrisokane Road, just south of the existing stormwater management pond. The fields are proposed to be accessed via the existing entrance along Borrisokane Road.
Along with potentially four ultimate fields, the new location is also proposed to include 2 full-sized soccer fields. The sports fields will be located within the 100-year floodplain limit of the Jock River, which is well-suited to accommodate sports fields; however, additional amenities such as play equipment, splash pads, and gazebos are not possible at this site. The park will be developed in accordance with the City’s Accessibility Design Standards.
You can download and review the proposed concept plan for the relocated Strandherd Ultimate Fields in the ‘Document Library’ on the right.
Please be aware that the final park plan may differ from the concept being presented as a result of the public consultation responses, technical reasons, and/or financial constraints.
Take the survey below to provide your feedback. The survey will be open until Monday, January 26th.
The City is looking for your feedback on the proposed plan for the relocation of the Strandherd Ultimate Fields, currently located at 4061 Strandherd Drive in Barrhaven West (Ward 3). The new location of the fields will be a short distance away, at 3180 Borrisokane Road, just south of the existing stormwater management pond. The fields are proposed to be accessed via the existing entrance along Borrisokane Road.
Along with potentially four ultimate fields, the new location is also proposed to include 2 full-sized soccer fields. The sports fields will be located within the 100-year floodplain limit of the Jock River, which is well-suited to accommodate sports fields; however, additional amenities such as play equipment, splash pads, and gazebos are not possible at this site. The park will be developed in accordance with the City’s Accessibility Design Standards.
You can download and review the proposed concept plan for the relocated Strandherd Ultimate Fields in the ‘Document Library’ on the right.
Please be aware that the final park plan may differ from the concept being presented as a result of the public consultation responses, technical reasons, and/or financial constraints.
Take the survey below to provide your feedback. The survey will be open until Monday, January 26th.