Ledbury Park Lifecycle Swing Replacement

Share Ledbury Park Lifecycle Swing Replacement on Facebook Share Ledbury Park Lifecycle Swing Replacement on Twitter Share Ledbury Park Lifecycle Swing Replacement on Linkedin Email Ledbury Park Lifecycle Swing Replacement link

The City is looking for input on new swing components being proposed to replace the existing swings in Ledbury Park which is located at 1250 Ledbury Avenue in Ward 16. The community is invited to identify their preferred option and to provide comments on the proposed equipment.

You can download and review the three proposed swing component options by following the link in the ‘Document Library’ (located on the panel to the right). The proposed plan has been designed to meet the City of Ottawa Accessibility Design Standards and will include the replacement of the existing sand under the play structures with engineered wood fiber safety surfacing.

Please note: this project falls under the Lifecycle Replacement program. Council has approved the budget and the scope. Therefore, upgrades and/or replacement of the other existing amenities in the park are beyond the scope of this project. Your understanding is appreciated.

Take the short survey below to share your preferred option and any additional comments. The survey will be open until February 28, 2025.

Please be aware that the final park plan may differ from the concept being presented as a result of the public consultation responses, technical detailing, and supply and/or financial constraints.

The City is looking for input on new swing components being proposed to replace the existing swings in Ledbury Park which is located at 1250 Ledbury Avenue in Ward 16. The community is invited to identify their preferred option and to provide comments on the proposed equipment.

You can download and review the three proposed swing component options by following the link in the ‘Document Library’ (located on the panel to the right). The proposed plan has been designed to meet the City of Ottawa Accessibility Design Standards and will include the replacement of the existing sand under the play structures with engineered wood fiber safety surfacing.

Please note: this project falls under the Lifecycle Replacement program. Council has approved the budget and the scope. Therefore, upgrades and/or replacement of the other existing amenities in the park are beyond the scope of this project. Your understanding is appreciated.

Take the short survey below to share your preferred option and any additional comments. The survey will be open until February 28, 2025.

Please be aware that the final park plan may differ from the concept being presented as a result of the public consultation responses, technical detailing, and supply and/or financial constraints.

  • Complete Form
    Share Survey on Facebook Share Survey on Twitter Share Survey on Linkedin Email Survey link
Page published: 05 Feb 2025, 01:27 PM