Share Cedardale Park on FacebookShare Cedardale Park on TwitterShare Cedardale Park on LinkedinEmail Cedardale Park link
Cedardale Park
The City of Ottawa is seeking input on concept plans prepared for the lifecycle replacement of the playground and swing equipment at Cedardale Park.
According to the Strategic Asset Management Plan (2017), the Ageing Assets Strategy states that “to maintain levels of service over time and to remain sustainable, not all assets should or can be replaced before reaching the end of their expected service life.”
Therefore, the scope of the current lifecycle replacement project is specific to;
upgrading the play structure and swings
Engineered wood fiber is proposed as the protective surfacing material for the playground to meet accessibility requirements
an accessible pathway to the play area.
Two different concept plans with images of the proposed playground equipment options are located in the Document Library on this page. Residents are invited to complete the following survey and provide comments on the playground equipment options.
A summary of public comments and the preferred option will be posted to this website upon completion of the public consultation.
Construction to commence 2025, pending budget approval.
Cedardale Park
The City of Ottawa is seeking input on concept plans prepared for the lifecycle replacement of the playground and swing equipment at Cedardale Park.
According to the Strategic Asset Management Plan (2017), the Ageing Assets Strategy states that “to maintain levels of service over time and to remain sustainable, not all assets should or can be replaced before reaching the end of their expected service life.”
Therefore, the scope of the current lifecycle replacement project is specific to;
upgrading the play structure and swings
Engineered wood fiber is proposed as the protective surfacing material for the playground to meet accessibility requirements
an accessible pathway to the play area.
Two different concept plans with images of the proposed playground equipment options are located in the Document Library on this page. Residents are invited to complete the following survey and provide comments on the playground equipment options.
A summary of public comments and the preferred option will be posted to this website upon completion of the public consultation.
Construction to commence 2025, pending budget approval.
Share Survey on Concept Plans on FacebookShare Survey on Concept Plans on TwitterShare Survey on Concept Plans on LinkedinEmail Survey on Concept Plans link