Bridgestone Drive and Eagleson Road Intersection Functional Design Study

Share Bridgestone Drive and Eagleson Road Intersection Functional Design Study on Facebook Share Bridgestone Drive and Eagleson Road Intersection Functional Design Study on Twitter Share Bridgestone Drive and Eagleson Road Intersection Functional Design Study on Linkedin Email Bridgestone Drive and Eagleson Road Intersection Functional Design Study link

The intersection of Eagleson Rd & Bridgestone Dr is an unsignalized T-intersection with single-stop sign control on the Bridgestone Dr approach (westbound). This intersection has been identified in the City’s New Traffic Control Devices Program as a candidate location for the implementation of traffic control. A roundabout option is also being considered. The City of Ottawa has initiated this Functional Design Study to evaluate design options for upgrading the intersection. Both traffic signals and roundabout options will be considered.


What is being asked of the public?

  • Do you have any comments on the Traffic Signal option (recommended option)?
  • Do you have any comments on the Roundabout option?
  • Do you have any other comments on this project?

Key Dates/Timeline

Public Information Session: February 6th, 7:30 PM to 9:30 PM (online)

Zoom Meet: https://us06web.zoom.us/meeting/register/7C2s8OgRTSixYGvUL9MQVA

Public Engagement period: February 6th – February 21st, 2025

Ways to Engage

Please share your thoughts by completing the Survey, which will be available from February 6th – February 21st, 2025.

The intersection of Eagleson Rd & Bridgestone Dr is an unsignalized T-intersection with single-stop sign control on the Bridgestone Dr approach (westbound). This intersection has been identified in the City’s New Traffic Control Devices Program as a candidate location for the implementation of traffic control. A roundabout option is also being considered. The City of Ottawa has initiated this Functional Design Study to evaluate design options for upgrading the intersection. Both traffic signals and roundabout options will be considered.


What is being asked of the public?

  • Do you have any comments on the Traffic Signal option (recommended option)?
  • Do you have any comments on the Roundabout option?
  • Do you have any other comments on this project?

Key Dates/Timeline

Public Information Session: February 6th, 7:30 PM to 9:30 PM (online)

Zoom Meet: https://us06web.zoom.us/meeting/register/7C2s8OgRTSixYGvUL9MQVA

Public Engagement period: February 6th – February 21st, 2025

Ways to Engage

Please share your thoughts by completing the Survey, which will be available from February 6th – February 21st, 2025.

  • Take Survey
    Share Feedback Survey on Facebook Share Feedback Survey on Twitter Share Feedback Survey on Linkedin Email Feedback Survey link
Page last updated: 07 Feb 2025, 12:19 PM