As We Heard It Report now available

Thank you to everyone who took the time to respond to the Bank Street Active Transportation and Transit Priority Feasibility Study survey. We are pleased to share the “As We Heard it” report, which summarizes the feedback received through the survey. Access the file in the documents section on the right side of this page.

The study team is continuing to analyze the options. A second public information session is planned to present the preliminary preferred design in winter 2025.

We will continue to post updates as the project progresses.