Atrium Park

Share Atrium Park on Facebook Share Atrium Park on Twitter Share Atrium Park on Linkedin Email Atrium Park link

Pickleball

Update: October 5, 2021

Construction of the Atrium Park project has commenced. Substantial construction completion is anticipated in fall 2022. Please note that additional time will be required before the soccer field turf is established and ready for sports field use.

Consultation Results

Thank you to everyone who provided their input on the playground equipment options for Atrium Park during the public consultation held in February. We heard from 51 residents, with 65 percent of residents preferring Option 1. The park is being designed to incorporate this playground equipment.

The project team is proceeding to make the following changes to

Pickleball

Update: October 5, 2021

Construction of the Atrium Park project has commenced. Substantial construction completion is anticipated in fall 2022. Please note that additional time will be required before the soccer field turf is established and ready for sports field use.

Consultation Results

Thank you to everyone who provided their input on the playground equipment options for Atrium Park during the public consultation held in February. We heard from 51 residents, with 65 percent of residents preferring Option 1. The park is being designed to incorporate this playground equipment.

The project team is proceeding to make the following changes to the park design in response to the comments that were proposed and received:

  • Adding separate swings in the junior play area
  • Creating a yellow, purple, blue and gray colour scheme for the playground equipment
  • Adding a balance beam to the playground area
  • Shifting the proposed pathway at the western side of the park away from the residential lots near the Andromeda Road walkway block
  • Relocating two trees to the area between the pathway and the western edge of the park
  • Adding a pathway from the Atrium Ridge sidewalk to the playground area
  • Adding Core Glow stones at the pathway nodes

A public consultation summary is provided in the document here.

Construction of the park is anticipated to commence in 2021.

Thank you again to everyone who participated!


The City is looking for your help to design a new park in Riverside South. Atrium Park is a proposed 2.4-hectare neighbourhood park located at 886 Atrium Ridge. We want your feedback on the park’s concept plan and proposed amenities. Atrium Park is surrounded by:

  • Atrium Ridge to the north
  • Brian Good Avenue to the east
  • Proposed Catholic elementary school to the south
  • Future homes to the west
  • A walkway that connects the park to Andromeda Road

We want your feedback on the proposed amenities including:

  • Full-size soccer field
  • Full-size basketball court
  • Doubles pickleball court
  • Playground with splash pad
  • Fitness equipment
  • Gazebo
  • Parking lot with 35 spaces
  • Pathways
  • Park furniture, like benches and tables
  • Landscaping

You can find the two-concept plan and images of the proposed amenities in the Document Library to the right. Take the survey below to tell us your preferences and provide comments on the amenities and the concept plan

Page last updated: 31 Oct 2022, 04:47 PM