Thank you to everyone who provided their input on the junior play equipment and swing replacement project for Helmock Park. More than 50 percent of participates who completed the survey preferred Option A with the Frog Jump Climber, Wobble Sphere Spinner and accessible sand digger.
A request was made to include wood chips as ground cover. The new play equipment and swings will be installed with Engineered Wood fiber for ground cover. The existing senior play structure will remain in sand as there are no changes to this structure.
The community also inquired if additional equipment such as a fitness circuit and saucer swing could be added to the park. These items were beyond the scope of this project. Councillor King contributed Ward Cash-in-Lieu of Parkland funding to include the installation of an outdoor fitness equipment station as well as a saucer swing in this project.
Construction is anticipated to being Fall 2024, weather and site conditions dependent. Construction completion is anticipated for Spring 2025.
The City is looking for your feedback on replacing the junior play equipment and swings at Hemlock Park in Ward 13. Hemlock Park is located at 361 Meadow Park Place. Updates to the junior play equipment will include:
Replacement of existing junior equipment with 2-3 new pieces of play equipment
New bay of swings including two belt swings, two junior buckets swings and an accessible swing
Engineered wood fiber of the projective surfacing material to meet accessibility requirements
Two accessible benches
Relocate existing ATV Spring Toy
The existing senior play structure in sand material will remain.
The concept plans and images are in the document library on the right. Take the survey below to select preferred junior play equipment and share your feedback.
Consultation has concluded.
Thank you to everyone who provided their input on the junior play equipment and swing replacement project for Helmock Park. More than 50 percent of participates who completed the survey preferred Option A with the Frog Jump Climber, Wobble Sphere Spinner and accessible sand digger.
A request was made to include wood chips as ground cover. The new play equipment and swings will be installed with Engineered Wood fiber for ground cover. The existing senior play structure will remain in sand as there are no changes to this structure.
The community also inquired if additional equipment such as a fitness circuit and saucer swing could be added to the park. These items were beyond the scope of this project. Councillor King contributed Ward Cash-in-Lieu of Parkland funding to include the installation of an outdoor fitness equipment station as well as a saucer swing in this project.
Construction is anticipated to being Fall 2024, weather and site conditions dependent. Construction completion is anticipated for Spring 2025.
The City is looking for your feedback on replacing the junior play equipment and swings at Hemlock Park in Ward 13. Hemlock Park is located at 361 Meadow Park Place. Updates to the junior play equipment will include:
Replacement of existing junior equipment with 2-3 new pieces of play equipment
New bay of swings including two belt swings, two junior buckets swings and an accessible swing
Engineered wood fiber of the projective surfacing material to meet accessibility requirements
Two accessible benches
Relocate existing ATV Spring Toy
The existing senior play structure in sand material will remain.
The concept plans and images are in the document library on the right. Take the survey below to select preferred junior play equipment and share your feedback.