Baseline Road and Rockway Crescent Functional Design Study

Share Baseline Road and Rockway Crescent Functional Design Study on Facebook Share Baseline Road and Rockway Crescent Functional Design Study on Twitter Share Baseline Road and Rockway Crescent Functional Design Study on Linkedin Email Baseline Road and Rockway Crescent Functional Design Study link

Project Description

The intersection of Baseline and Rockway is an unsignalized T-intersection with a stop control on Rockway. The need for a traffic signal was determined through the City's New Traffic Control Device program, as it has met the warrants for a pedestrian signal. The City of Ottawa has initiated a functional design study to evaluate a protected intersection design for this intersection.

Online Public Information Session

Residents are invited to participate in a Public Information Session via TEAMS for a presentation and review the intersection functional design on Tuesday, July 23rd 6:30-8:00 PM.



After the Public Information Session, residents will have an opportunity to provide feedback during the comments period that will be open for 2 weeks from July 26th - August 9th. Documents from the presentation will be available in the ‘Documents’ folder on the right.

Project Description

The intersection of Baseline and Rockway is an unsignalized T-intersection with a stop control on Rockway. The need for a traffic signal was determined through the City's New Traffic Control Device program, as it has met the warrants for a pedestrian signal. The City of Ottawa has initiated a functional design study to evaluate a protected intersection design for this intersection.

Online Public Information Session

Residents are invited to participate in a Public Information Session via TEAMS for a presentation and review the intersection functional design on Tuesday, July 23rd 6:30-8:00 PM.



After the Public Information Session, residents will have an opportunity to provide feedback during the comments period that will be open for 2 weeks from July 26th - August 9th. Documents from the presentation will be available in the ‘Documents’ folder on the right.

  • Comments
    Share Comments on Facebook Share Comments on Twitter Share Comments on Linkedin Email Comments link
Page last updated: 29 Jul 2024, 12:28 AM